CS615 Midterm Past Paper

You have come here while searching for CS615 midterm past papers. But before going to download the CS615 midterm past paper. I have a better option for you. That is, that you can attempt the online quiz of CS615.

Practice Quiz from CS615 Midterm Past Paper

This quiz will evaluate your preparation for the CS615 midterm examination and it is based on the past papers of CS615. The purpose of this quiz is to evaluate your performance in this subject. If you can pass this quiz, then there is a great chance that you can secure good marks in your exams.





0%
0 votes, 0 avg
4

Your Time starts now

Times Up


Created on By faisal_faisi

CS615

midterm past paper quiz

CS615 Midterm Past Papers Practice Quiz

Welcome to CS615 Midterm Online Practice Quiz.

You can check your preparation of CS615 for your Exams here.

Questions Will be different every time you will attempt.

1 / 30

Category: CS615-mid

1. Foundational design concepts are.

2 / 30

Category: CS615-mid

2. Risk analysis and management are a series of steps that help a software team to understand and manage _           .

3 / 30

Category: CS615-mid

3. Throughout evaluation and solution synthesis, the analyst's primary focus is on

4 / 30

Category: CS615-mid

4. These all are Product Transition Factors except

5 / 30

Category: CS615-mid

5. A ‘facilitator’ controls the meeting can be                   .

6 / 30

Category: CS615-mid

6. The Efficiency with which a program runs on different platforms or operating systems is called :

7 / 30

Category: CS615-mid

7. Upon evaluating current problems and desired information (input and output), the analyst begins to          .

8 / 30

Category: CS615-mid

8. The Introduction of the software requirements specification states the

9 / 30

Category: CS615-mid

9. Each                  can be subdivided into sub tasks.

 

10 / 30

Category: CS615-mid

10. Cognitive model describes a system as perceived by its         

11 / 30

Category: CS615-mid

11. You can use the Item Traceability Matrix to identify                at the end of each phase

 

12 / 30

Category: CS615-mid

12. These all are outputs of Initiating Process except

13 / 30

Category: CS615-mid

13.                   theory when the deliverables of a project are more important than its phases. This normally happens when the deliverables are decided before the project begins.

 

14 / 30

Category: CS615-mid

14.                  is path finding                , is path following

15 / 30

Category: CS615-mid

15. A meeting is conducted at a  and attended by both software engineers and customers

16 / 30

Category: CS615-mid

16. Most software project manager’s practice a lot of management techniques that are of doubtful authenticity are called

 

17 / 30

Category: CS615-mid

17. The check-in and checkout facilities provide                      

18 / 30

Category: CS615-mid

18.                  is a software engineering task that bridges the gap between system level requirements engineering and software design.

19 / 30

Category: CS615-mid

19. Finally, the specification includes a    

20 / 30

Category: CS615-mid

20. Which organization has set the de facto standards for project management techniques?

21 / 30

Category: CS615-mid

21. All of the following describe the activity list except:

22 / 30

Category: CS615-mid

22. Synchronization control helps to ensure that parallel changes performed by two different people do      .

23 / 30

Category: CS615-mid

23. _____ensures that appropriate steps to follow the product development procedures are carried out

24 / 30

Category: CS615-mid

24. Both the software engineer and customer take an active role in software requirements engineering-a set of activities that is often referred to as Requirement:

25 / 30

Category: CS615-mid

25. McCall (MCC77) and his colleagues proposed some software quality factors based on three most important aspects of a software product: Which organization has set the de facto standards for project management techniques?

26 / 30

Category: CS615-mid

26. Software requirements engineering is a process of all except

 

27 / 30

Category: CS615-mid

27. To                 risks from occurring, the project team prepares the risk plan before the commencement of the project.

 

28 / 30

Category: CS615-mid

28. A node on a network schedule is that point in time at which an activity                 .

 

29 / 30

Category: CS615-mid

29.             identifying which quality standards are relevant to the project and determining how to satisfy them.

30 / 30

Category: CS615-mid

30. These all are design phase activities except

 

Your score is

The average score is 92%

Share your results with your fellow students

LinkedIn Facebook Twitter VKontakte
0%

Exit

Note before downloading CS615 midterm past paper

One thing to note dear fellows that you must don’t rely on these papers only. They can be a source of help but not an ultimate solution. If you want to get good marks in your exams you are advised to go through all of your handouts and must watch all of the video lectures.

Golden rules for good marks in VU Exams.

As per my experience, I have developed some golden rules for getting good marks in Virtual University Exams based on experience. I got 3.96 CGPA by following these rules.So here they are:
  1. Never miss your Quiz, Assignment, or GDB.
  2. Always try to do your Assignment on your own.
  3. Try your best to finish your video lectures 10 days before exams.
  4. Try your best to read your handouts twice before exams.
  5. Read forward attempt backward.
  6. Never schedule more than one paper on the same day.
  7. Your most difficult paper should have a gap of 1 or more days.
  8. Toughest paper must be scheduled first.
  9. Read questions forward and attempt backward.
  10. Don’t waste your time during a paper on illegal activities.